POTABLE WATER STORAGE PROJECT

potable water storage
Asset x

LARGE-CAPACITY WATER RESERVOIRS STRATEGICALLY LOCATED THROUGHOUT NEOM

Potable water reservoirs, able to satisfy up to five days of demand, will be built at key points in the network. Most of these reservoirs are significant concrete structures with a storage capacity of over 100,000 m3.

Neom launches the Line

NEOM'S INNOVATION HUB

NEOM’s Innovation Hub will house Centers of Excellence focusing on applied and commercial research for water specific R&D projects. Right now, we’re focusing on renewably powered advanced desalination of seawater, zero waste and recycled water reuse. Longer term interests include advanced water recycling treatment, brine processing, smart sensors and smart water usage, industrial demand reduction processes, and stormwater harvesting.

INVITATION TO TENDER

For Pipeline and Pumping Stations
Tenders will be invited from pre-qualified bidders for design build or design bid build packages, for pipeline and pumping stations on multiple or single routes throughout 2021, commencing in the third quarter, and continuing into 2023. Up to ten pipeline and pumping station packages will be awarded with a total value in excess of $3.5bn USD.

For Reservoirs and Storage Tanks
Tenders were invited from pre-qualified bidders for design build or design bid build packages for the large reservoirs commencing third quarter 2020 and continuing into 2021. Smaller storage tanks will be packaged in 2021.
Up to nine reservoir and tank packages will be awarded with a total value in excess of $0.6bn USD.

AdobeStock
GettyImages

Previous

BRINE PROCESSING PLANT

BRINE PROCESSING PLANT
 Yuba Capozzola LowRes TOURISM

Next

Transmission & storage

Transmission & storage